The daily report must contain all the elements applicable to the declared day including, in particular,(1) the drilling authorization number;
(2) the name of the drilling installation;
(3) the number of persons on board the drilling installation;
(4) a description, in chronological order, of the work carried out and the time required for carrying out each step of the work;
(5) the name of the enterprises that carried out the work;
(6) the operating condition of the blowout prevention system;
(7) the measured depth reached during the day;
(8) the composition of the drilling fluid and the spacer fluid and the volumes used;
(9) a loss of circulation;
(10) the components used to assemble the drill strings;
(11) the specifications of the casing and its setting depth;
(12) the weight applied to the bit and its penetration rate;
(13) the measurements of the deviation of the well path in dip, azimuth and depth;
(14) traces of petroleum or water detected;
(15) the type of pump used and its capacity;
(16) the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
(17) the well logs carried out;
(18) the observations and data related to the evaluation or characterization of the geological formation;
(19) the fluid samples collected;
(20) the results of the pressure and leak tests;
(21) the volume and composition of the gas used, released, incinerated or burned at the flare;
(22) the composition, concentration and detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
(23) the operational problems encountered and the corrective measures taken or planned;
(24) the indication of any temporary drilling work interruption and the procedure followed to secure the well;
(25) the indication of any event that disrupted the progress of the work;
(26) the abnormal meteorological conditions that caused an operation delay, in particular, due to(a) visibility;
(b) temperature variation;
(c) wind speed or direction;
(d) the height, period and direction of the waves and swells;
(e) the size, distance and direction of ice;
(f) icing; and
(g) rolling, pitch and vertical motion of the vessel or platform; and
(27) any other information or document deemed necessary by the Minister.